Emerging Auckland looks back to the mid-1980s, when Auckland was undergoing a construction boom.
At the time, there were 23 major buildings under construction in the Auckland CBD.
Emerging Auckland looks back to the mid-1980s, when Auckland was undergoing a construction boom.
At the time, there were 23 major buildings under construction in the Auckland CBD.