AT storm recovery works contractors are taking a two week summer break over the holiday period. The last day of work will be Friday 20 December 2024, returning Monday 6 January 2025.
The following sites currently under construction are planned to be completed before the holidays (pending construction progress and weather):
-
South
-
Te Toro Road, Pollock, Āwhitu Peninsula.
-
-
North Urban
-
Lonely Track Road, Albany.
-
-
North Rural
-
Pinchgut Road, Kaukapakapa
-
Pine Valley Rd Culvert, Dairy Flat
-
Leigh Road, Leigh
-
Smyth Road, Warkworth.
-
-
Central
-
Basset Road, Remuera.
-
-
West
-
Simpson Road, Swanson
-
Scenic Drive, Titirangi – from Woodlands Park to the Roundabout
-
Karekare Road, Karekare
-
Kellys Road, Oratia
-
Wairere Road, Bethells.
-
The following sites under construction where work is continuing, will be made safe during the summer shutdown period:
-
North Urban
-
Duck Creek Road, Silverdale – the barriers are planned to be removed and the road opened with shoulder closures on both sides.
-
Hibiscus Coast Highway, Hatfields Beach – the barriers are planned to be removed and the road opened with shoulder closure and “uneven surface” signs.
-
John Brian Drive #2, Red Vale – the road is planned to be opened and temporary fall protection installed with a shoulder closure.
-
-
North Rural
-
Ahuroa Rd – light stop/go set up will remain in place.
-
Takatu Road, Tāwharanui Peninsula – the road will be reopened to two lanes.
-
All sites will be made safe and daily site checks will be done by Traffic Management teams.
The following roads will remain closed:
-
North Rural
-
Red Hill Road, Te Ārai.
-
-
West
-
Kay Road, Waitākere
-
Paturoa Road 17, Titirangi
-
Scenic Drive, Waiatarua, West Coast Road to Arataki Visitors Centre.
-
-
South
-
Manukau Heads Road, Manukau Heads.
-
For further information visit AT’s storm recovery page.