Walkways
News203 Results

Show time for Panmure Basin bridge
The curtain is about to be raised on works to prepare for installation of the new Panmure Basin bridge for pedestrians, scooters and bikes.

Targeted paths rate sent for final approval
Franklin Local Board will ask the Governing Body to give final approval to a targeted rate for the area to fund paths and pedestrian improvements.

Board outlines transport priorities
Papakura Local Board has a top 10 of transport concerns.

Bridge will give kids safe way to school
Work is set to start on a bridge that will give children access to Tamaoho School.

Maraetai crossing will keep the kids safe
A raised pedestrian crossing will be installed outside Maraetai Beach School.

Board works with AT to resolve issues
Manurewa residents' traffic concerns have the local board working with Auckland Transport.

Wynyard Crossing Bridge preventative maintenance underway
The Wynyard Crossing Bridge is needing extensive maintenance work so it can operate more reliably and to address potential safety risks.

Time to build a bridge in Panmure
Construction material is being procured and preparations to meet resource consent conditions are underway. Manufacturing the replacement bridge is expected to begin offsite from June 2024, with installation around the end of November 2024.